There however, only the automotive parts and lesser fittings were built in: the armoured hull was in its entirety prefabricated by forges serving as subcontractors.
As it can be observed all systems are divided into main two groups prefabricated (which is made in factories) and those posts that are made in laboratory or in surgeries.
The falsework to perform this task is a pair of substantial truss bridges, prefabricated in segments, with columns and span segments lifted into place by barge cranes.