The risk of condensation can be reduced by avoiding cold bridges, using a vapour control layer to keep moisture out of the wall and by ventilating cold cavities.
It is hypothesized that the drilling perforated an anhydrite layer bringing high-pressure groundwater to come into contact with the anhydrite, which then began to expand.
This initial layer prevents hydrogen from penetrating deep into the steel substrate, thus avoiding the serious problems associated with hydrogen embrittlement.
The cytotrophoblast layer spreads and contacts the cytotrophoblast layers of neighboring anchoring villi, creating a continuous layer called the cytotrophoblastic shell.